About this role
SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today SpaceX is actively developing the technologies to make this possible, with the ultimate goal of enabling human life on Mars.
POWER PLANT ENGINEER
SpaceX is building and operating combined-cycle gas turbine power plants that must come online, stay online, and perform. This role owns the design and build of the full power plant: gas turbines, mechanical and electrical balance of plant, and everything else that keeps the plant running at rated output, day after day. This is not a desk job. You will be constructing the power plant, owning commissioning in the control room during startup, and in the field troubleshooting.
RESPONSIBILITIES:
• Support the full lifecycle of gas turbine power generation assets — installation, commissioning, startup, operations, and long-term maintenance
• Lead or support commissioning activities including combustion tuning, control system checkout, protective relay testing, and performance/reliability run verification
• Own root-cause analysis and corrective action for turbine trips, forced outages, and performance degradation; drive fixes that prevent recurrence
• Develop and refine operating procedures, startup/shutdown sequences, and abnormal operating condition playbooks
• Interface directly with OEMs (GE, Siemens Energy, Mitsubishi Power, Doosan) on warranty issues, LTSA scope, outage planning, and technical issues
• Plan and execute major/minor inspections, hot gas path outages, and combustion inspections in line with OEM maintenance intervals
• Analyze turbine performance data (heat rate, capacity factor, degradation curves) to identify efficiency losses and recommend corrective action
• Coordinate with balance-of-plant teams (HRSG, steam turbine, cooling systems, water treatment) to ensure integrated performance
• Build and maintain relationships with EPC contractors during construction handoff to ensure a clean transition from construction to commercial operation
• Develop spare parts strategy, critical spares inventory, and maintenance budgets
BASIC QUALIFICATIONS:
• Bachelor’s degree in Mechanical Engineering, Electrical Engineering, or a related engineering discipline
• 2+ years of hands-on experience with utility-scale gas turbines in commissioning, operations, or maintenance roles
PREFERRED SKILLS AND EXPERIENCES:
• Working knowledge of combined-cycle plant systems: gas turbines, HRSGs, steam turbines, generators, and balance-of-plant equipment
• Experience reading and interpreting P&IDs, single-line diagrams, and turbine control logic
• Direct commissioning experience with GE 7/9HA, Siemens Energy SGT6/8-8000H, Mitsubishi M501/701JAC, or Doosan H-class turbines
• Experience with DCS/turbine control platforms (Mark VIe, SPPA-T3000, or equivalent)
• Familiarity with LTSA structures, OEM contract negotiation, and outa